亚洲 高清 成人 动漫-俺去俺来也在线www色官网-日本内射精品一区二区视频-波多野结衣无内裤护士

AMI System Solution
AMI System Solution


Functions
Administration

? Meter Administration
? Concentrator Administration
? Monitoring of System Components Replacement History
? Monitoring of Command and Parameter History of System Components
? Defining of Roles and Users/User Groups
? Access Control to System Components and AMR Centre
? Administration of reporting functions of AMI Centre
? Regular Automatic Backup of All Data At the Desired Time

Data Reading/Collection and Archiving

? Reading of Individual Concentrator/meter

? Reading of the Group of Concentrators/Meters

? Automated Reading According to the Sequence

? Reading On Request

? Periodical Reading on Request

? Special Reading on Request

? Data collected automatically according to the sequence set in advance include the following

  ? Daily Register Values

  ? Meter States

  ? Electricity Quality Log

  ? Event Log

  ? Load Profile

  ? Hourly Register Values

  ? State of Monthly Accounting Registers

  ? Time and Date


? Data collected from the meter on request including:

  ? Effective Voltage Values Per Phases At the Moment of Reading

  ? Effective Current Values Per Phases At the Moment of Reading

  ? Current Power–(Load Power At the Moment of Reading)

  ? Tariff Programmer

  ? Integration Period for 15-Minute Maximum Power

  ? Consumption Management Parameters

  ? Parameters for Voltage Thresholds Within Electricity Quality Log

  ? Parameters or Time Intervals of Profiles

  ? Parameters for Registers Within Profiles

  ? Parameters Related to the Presentation On Meter Display

  ? Archive States of Accounting Registers

  ? Current State of Bi-stabile Switch

  ? Meter Software Version

  ? Factory Number and Type of Meter


? Data read according to the sequence from the concentrator including:

  ? Statistics of Communication / Emergency and Regular Reports


? Data read from the concentrator upon the request including:

  ? Concentrator Data Archive

  ? Reading Programmes/Sequences

  ? Management/Parameterisation Programmes/Sequences

  ? Programmes/Sequences Execution Priorities

  ? Communication Routes

  ? Concentrator Response Time and Frequency Parameters

  ? Communication Parameters of the Concentrator

  ? Current Date and Time

  ? Other Concentrator Parameters

  ? Concentrator Software Version

  ? Records on Concentrator Parameter Changes and Adjustments

Reporting functions

? Reports with Analysis of Statuses and Alarms

? Reports on Electricity Quality

? Reports Related to Parameterization and Management

? Communication Reports

? Control Reports

? Reports Generated by the Concentrator

Data and Information Exchange with Other Information Systems and Subsystems of Electric Utility Robust protocol library for various types of DCUs and electronic energy meters, DLMS/COSEM, IEC61870-5-102 compliant
主站蜘蛛池模板: 靖宇县| 新密市| 南召县| 甘肃省| 万全县| 通城县| 浦城县| 东辽县| 吉林市| 微山县| 潼关县| 五河县| 萝北县| 原阳县| 长寿区| 胶南市| 桐庐县| 色达县| 湟中县| 驻马店市| 松溪县| 神木县| 南丹县| 临沭县| 临漳县| 宁化县| 高淳县| 赤城县| 定结县| 扎赉特旗| 墨脱县| 湖南省| 祁东县| 邓州市| 葵青区| 阿城市| 中方县| 陈巴尔虎旗| 邯郸市| 庆城县| 凭祥市|